Tuesday, May 15, 2007

Update on finishing the basement...

Well...

I have approximately half the basement covered in Sheetrock. I have several major items (pipes and breaker box) all boxed out and covered in Sheetrock. I am very pleased with the progress so far. I hope to get a few more sheets hung tonight as well as making some progress on the built-in entertainment center.

The next major challenge will be building the wall and installing the door way for the water heater and air conditioner. After that it will be to tackle the ceiling.

More updates to follow as well as pictures.